TGViewer
Channel Public Channel
teleLakel
Subscribers
17.5K
Photos
563
Videos
203
Links
400
Recent Posts 18 shown
Post #1163 4.73K
A new ignore_restriction_reasons parameter has appeared in the test AppConfig.

It now contains two restriction reasons that the client should ignore:
× sensitive
× porn

This is directly related to restrictionReason. If the reason in a restriction matches a value from ignore_restriction_reasons, the client ignores that restriction.

This means content with restrictionReason porn or sensitive, which was previously blocked at the client level, will likely no longer be blocked due to this restriction when this config is enabled.

@telelakel
Post #1162 7.54K
In the new Telegram Beta for Android v12.10.4 (7093), the quality of video messages has been improved.

Video messages are now recorded at 480×480 instead of the previous 384×384, at 30 FPS.

@telelakel | #new_tgbeta
Post #1160 7.34K
In the new Telegram Beta for macOS v12.10.283233, the built-in Gram Wallet has been added.
Also, the minimum sending amount is 0.1 Gram.

Previously mentioned:
[View 1], [View 2], [View 3], [View 4], [View 5], [View 6]

@telelakel | #new_tgbeta
Post #1159 8.46K
In the test and, later, the production AppConfig, the blockchain explorer has been changed from «Tonviewer» to «Tonscan».

This is likely because Tonviewer displays casino ads on its main page.

@telelakel
Post #1158 7.29K
teleLakel For now, you will be temporarily redirected to the third-party @wallet.
As expected, the username of the third-party Wallet (@wallet) has been replaced with @sendgrams in the TON Connect configuration.
This is necessary to allow services to connect to Telegram’s built-in wallet.

Previously mentioned:
[View 1], [View 2], [View 3], [View 4], [View 5]

@telelakel
Post #1157 8.45K
Telegram is sending users a warning from a service account about fake accounts of third-party NFT gift marketplaces.

The message is sent after a user sends their NFT gift to a third-party marketplace.

Telegram warns users to be careful and watch out for fake accounts pretending to be third-party NFT marketplaces.

@telelakel
Post #1156 8.66K
A new built-in Telegram Wallet has been added to the TON Connect configuration.

Connecting services to this wallet is not available yet. For now, you will be temporarily redirected to the third-party @wallet.

Previously mentioned:
[View 1], [View 2], [View 3], [View 4]

@telelakel
Post #1155 9.95K
fragment.com has completely disappeared from Google search results, while it still appears in other search engines.

Previously, Fragment appeared incorrectly in Google search results. Sometimes the query was displayed in a language other than English, sometimes the page contained a referral link or led directly to a specific username auction.

@telelakel
Post #1154 31.3K
Unlimited hidden gifts can no longer be sent using userbots or regular bots. These gifts are now considered permanently deleted.

@telelakel
Post #1153 12.2K
teleLakel The bug has also been fixed on iOS, but users will have to wait for the stable update, which will likely be released within the next few days or weeks.
Telegram for iOS v12.9.4 has been released with a fix for crash stickers.

@telelakel
Post #1152 12.5K
teleLakel Photo
The new update on Telegram's contest website, contest.com, was made to distribute prizes to participants of the Digital Freedom contest.

Each participant will receive their prize directly to a crypto wallet in USDT on TON.

@telelakel
Post #1151 12K
teleLakel 🏎 Limits for folders have been increased for non-Premium users — they are now the same as for Premium users.
Update: The increased folder limits only apply to non-Premium users who have never had Telegram Premium before.

If you previously had Telegram Premium, you’ll need to subscribe to Premium again to get the increased limits.

@telelakel
Post #1150 11.5K
🏎 Limits for folders have been increased for non-Premium users — they are now the same as for Premium users.

Non-Premium users can now create up to 30 folders (previously up to 10) and add up to 200 chats to each folder (previously up to 100).

🌀 The test BotFather MiniApp has also received new functionality for managing a bot's NFT usernames. You can hide them, change their position, and more.

@telelakel
Post #1148 10.3K
A new feature for completing a Claim related to TON wallets has been added to Telegram's test website contest.com.

The new process allows users to:
— Connect a TON wallet through TON Connect;
— Verify wallet ownership through TON Proof;
— View the verified address and change the connected wallet;
— Enter their name, country, street, city/region and postal code;
— Review the entered information before submitting;
— Edit the information or change the wallet;
— Submit the final Claim.

It is currently unknown what exactly this feature is intended for. It is likely being prepared for a new type of Contest where a TON wallet and the Claim mechanism will be used.

@telelakel
Post #1147 11.9K
teleLakel 😵 For several days, users have been sending stickers in chats that can cause the app to crash or become unresponsive. Android users were not affected because Telegram uses a new Lottie rendering library called «tlottie», while Telegram Desktop and iOS users…
Be careful when sending crash stickers. Sending these stickers can get your account frozen or permanently banned.

Spreading these stickers makes your IQ lower 🤪

@telelakel
Post #1146 15.1K
😵 For several days, users have been sending stickers in chats that can cause the app to crash or become unresponsive. Android users were not affected because Telegram uses a new Lottie rendering library called «tlottie», while Telegram Desktop and iOS users experienced app crashes.

Telegram Desktop v7.2.7 is now available, and users can update to it to fix the bug.

The bug has also been fixed on iOS, but users will have to wait for the stable update, which will likely be released within the next few days or weeks.

@telelakel
Post #1145 12.5K
💬 In Telegram Desktop (Canary #42), a new feature for saving messages using the Ctrl+S shortcut has been added.

If you're writing a long message and need to quickly reply to something else, press Ctrl+S. A button with your temporarily saved message will appear in the bottom-right corner.

After pressing this button, your saved text will be restored.

@telelakel | #tg_desktop
Post #1144 14.1K
teleLakel 💎 In the new Telegram Beta for iOS v12.10.0 (34738), Gram Wallet has been added. It doesn't work yet and is currently view-only. First 5 transfers each day are free, the rest cost almost nothing. Previously mentioned: [View 1], [View 2] @telelakel | #new_tgbeta
💎 I analyzed the code of Telegram Beta for iOS v12.10.0 (34738) and found more detailed information about the upcoming Gram Wallet.

🐶 Here is what is known:
— Creating, importing and restoring Gram Wallet
Users will be able to create a new wallet using a Recovery Phrase, while importing a wallet will support 12- or 24-word phrases. Telegram will check whether the entered words and the Recovery Phrase itself are valid. Wallet recovery on a new device will also be supported.

— Recovery Phrase protection and backup
The wallet's secret data will be securely stored on the device and should not leave it in an unencrypted form. The Recovery Phrase can be stored in an encrypted backup: it is split into several encrypted parts and distributed across Telegram's data centers. Access to the backup is additionally protected by the two-factor authentication password. During recovery, the data is collected and decrypted locally on the new device.

— Key Rotation without changing the address
Key Rotation will allow users to replace the keys of an existing Wallet while keeping the wallet address and transaction history unchanged. After that, the old key will no longer be able to sign new operations.

— Gram and TON DNS transfers
The Wallet will support sending Gram to blockchain addresses and ".ton" names. Before sending, it will check the balance, the current wallet state, the fee and the possible result of the transaction. It will also be possible to send the entire available balance with the fee calculated automatically.

There will also be an option to send Gram directly to Telegram users. You will be able to select a recipient from your contacts, use the «Money» button in the attach menu, or open a user's profile and select the corresponding action from the three-dot menu. In this case, the Wallet will determine the appropriate way to credit the funds to the selected user, so there will be no need to manually copy a blockchain address.

— Encrypted comments
Encrypted comments can be added to Gram transactions. The text will be encrypted for the recipient before being added to the blockchain transaction.

— NFTs, Collectibles and Jettons
The Wallet will be able to store, view and transfer NFTs, as well as work with Jettons. Before sending an NFT, its owner and current state will be checked, including whether the asset is currently listed for sale or placed in an auction. The Wallet will also automatically calculate the required fee for transferring an NFT.

— TON Connect and Web3
The Wallet will be able to connect to Web3 apps through TON Connect. Users will see information about the connected app and the requested permissions, after which they can approve or reject the connection. Web3 apps will be able to request transactions, message signatures and TON Proof. Before executing an operation, the Wallet will verify it and require confirmation through Face ID or Touch ID.

— Buying cryptocurrency with fiat
Gram Wallet already has a system prepared for purchasing cryptocurrency with regular money. Users will be able to select a cryptocurrency, fiat currency, payment provider, payment method and amount. Before the purchase, the Wallet will check whether the operation is available in the user's region, supported currencies and payment methods, minimum and maximum limits, as well as the current exchange rate and final amount. After confirmation, a payment session will be created with a predefined Wallet address for receiving the cryptocurrency. The payment providers will likely be MoonPay and Ramp Network.

Most of these features are not yet available to users through the visual interface — they are currently implemented only at the code level. These features may change or be expanded with new functionality in the future.

@telelakel
Older posts →

About this channel

How can I read @telelakel without a Telegram account?
TGViewer shows the public web preview Telegram publishes for teleLakel: recent posts, photos, videos and the subscriber count, with no app, login or account.
How many subscribers does teleLakel have?
teleLakel (@telelakel) has 17.5K subscribers on Telegram, refreshed roughly every 30 minutes.
Does teleLakel know I viewed it here?
No. Public channel previews carry no viewer identity, and TGViewer has no accounts or tracking of what you look up.
Threads Profile ViewerView any public Threads profile without an account.Open ThreadLook →Writing with AI? Make it sound human.Metric37 rewrites AI drafts so they read naturally. Free AI detector, 1,500 words free.Try Metric37 →