Construction has kicked off for Panamint Capital's massive new solar energy project in Bremond, Texas, which will eventually generate 1.2 GW of power. This installation aims to change how we use industrial land by placing clean energy infrastructure directly alongside active fossil fuel operations.
The project, known as Big Rooter Power, will be built on the site of the Twin Oaks power station. Instead of clearing the land, the developers will install 2,000,000 solar panels around the existing coal mining facilities. This $1.7 billion development is divided into three distinct steps to manage the transition:
🔹 The first phase, Big Rooter West, adds 491 MW of capacity by August 2028.
🔹 The second phase, Big Rooter East, adds 658 MW, with construction starting in December 2026 and finishing by August 2029.
🔹 The entire project will create over 800 construction jobs in the region.
While other energy initiatives like the Gateway Solar & Storage site in Illinois have paved the way for reusing older industrial land, this site is set to become the largest solar array ever built at an active coal mine in North America. It is a practical test of how to squeeze more life and electricity out of land that is already tied to the power grid.
Repurposing old industrial sites is the next logical step for grid growth.
#energy #texas #solar
Canary Media
Subscribe