Scheduling Metrics
How do we know if a Scheduler is good?
In the previous section, we learned that the Scheduler is responsible for determining which Thread or Process will get its turn and run on the CPU
But we have an important question:
How do we know if a Scheduling algorithm is really good?
Suppose we have three Processes:
A
B
C
Scheduler
can run these in different orders
So we need to have a set of criteria so that we can compare the performance of different algorithms
This is where we come to Scheduling Metrics
Turnaround Time
The first concept:
Turnaround Time
In simple terms, it means:
How much time has passed from the moment a Job enters the system to the moment its work is completely completed?
The formula is:
Turnaround Time =
Completion Time - Arrival Time
For example:
Arrival Time = 0
Completion Time = 10
So:
Turnaround Time = 10 - 0
= 10
That means this Process has been in the system for 10 time units from the moment it entered until the end
Waiting Time
Now another question:
How much time did the Process
just wait for the CPU?
Here we come to:
Waiting Time
Assume the state of a Process is as follows:
Arrival
↓
Waiting
↓
Running
↓
Waiting
↓
Running
↓
Finished
Any time the Process waits in the Ready Queue for the CPU is counted as Waiting Time
So very simple:
Waiting Time =
The amount of time the Process has been waiting for the CPU
Response Time
This one is especially important for interactive programs
Response Time
How long did it take from the time the Job entered the system until the first time the CPU reached it?
For example:
Arrival
│
│ 5ms
▼
First Run
So:
Response Time = 5ms
Now pay close attention to the difference with Turnaround Time
Response Time
Only until the first run:
Arrival → First Run
Turnaround Time
Until the complete end of the job:
Arrival → Completion
So a Process may run very quickly the first time, but it may take a long time to finish its work
A complete example
Let's assume we have three Jobs:
Job A
Arrival = 0
Runtime = 5
Job B
Arrival = 0
Runtime = 3
Job C
Arrival = 0
Runtime = 2
Let's assume the Scheduler decides to run in this order:
A → B → C
So the Timeline becomes:
0 5 8 10
|--------|--------|--------|
A B C
Now let's calculate one by one
Job A
A
started at:
0
and finished at:
5
So:
Turnaround = 5 - 0
= 5
Since A was executed immediately:
Response = 0
Job B
B
started at:
5
and finished at:
8
.
So:
Turnaround = 8 - 0
= 8
And since B waited for the CPU from time 0 to 5:
Response = 5
Job C
C
started at time:
8
and finished at:
10
So:
Turnaround = 10 - 0
= 10
And:
Response = 8
Because C waited until time 8 to finally get the CPU
The average is also important
Usually we are not going to examine just one Process
We want to see how our algorithm performed overall
So we take the average
For example:
Turnaround:
A = 5
B = 8
C = 10
Average:
(5 + 8 + 10) / 3
= 7.67
So:
Average Turnaround Time = 7.67
We can do the same for other metrics like Let's do Response Time too
A Simple Scheduler Problem
Now let's look at a more interesting case.
Suppose we have:
A = 100ms
B = 2ms
C = 2ms
And the Scheduler says:
A → B → C
Timeline
It becomes:
0 100 102 104
|-------------------------|------|------|
A B C
That means B and C have to wait until A finishes its work
As a result:
Response Time B = 100ms
Response Time C = 102ms
While B and C themselves only have 2ms of work
That means a heavy job can make small jobs wait for a long time
This is where Shortest Job First comes in handy
If we know in advance how long the jobs will take, we can execute the shorter jobs first
For example:
A = 100ms
B = 2ms
C = 2ms
So instead of:
A → B → C
we can have:
B → C → A
Timeline:
0 2 4 104
|----|----|--------------------------------|
B C A
Now B and C get their first response very quickly
This is the basic idea of the algorithm:
Shortest Job First (SJF)
But here we have a problem
The operating system usually does not know in advance exactly: