DMIT Network Incident Report: LAX & HKG
This is the last update until there is another major event needs to be updated.
Here is the combined technical postmortem regarding the recent network instability.
🇺🇸 LAX CN2 GIA Incident
Current Status: All immediate mitigations applied. Final correction from CTG is pending due to the China-wide "Network Freeze" (ending Dec 15).
1. Root Cause: Prefix Limit Exceeded
The Mismatch: DMIT ordered a 1k prefix-limit, but the provider (CTG) left it at the default 300. This parameter is non-testable after service delivery, so we trusted the configuration.
The Trigger: Two clients increased route announcements + multiple DDoS RTBH routes pushed the count over 300.
The Result: AS4809 (CN2) immediately idled the BGP session upon exceeding the limit.
2. Why did failover result in packet loss?
Design: The redundant session (CoreSite) remained UP as designed (filtering DDoS routes to save prefix space).
The Critical Failure: Provider LACP Misconfiguration. CTG configured our link aggregation as a single interface capacity, ignoring our multiple physical 10G connections.
Impact: When traffic shifted to CoreSite, it exceeded the logical 10G cap, causing severe congestion and packet loss despite physical capacity being available.
3. Why the long recovery?
Administration: Due to the "Network Freeze," router CLI access is suspended.
Approval: CTA/CTG required emergency access approval from the Group level. Since it was after-hours in China, getting this authorization took significant time.
================
🇭🇰 HKG Incident
Current Status: 99.9% of traffic is successfully filtered. Active monitoring in place. 10Mpps ongoing.
1. Root Cause: "Carpet Bombing"
Attack Type: A massive Carpet Bombing attack targeted 3 specific subnets.
Vectors: Mixed volume of TCP-SYN, TCP-ACK (Zero/Empty), SYN-ACK, TCP Null, FIN, RST.
2. Why did mitigation fail initially?
The Leak: A combination of misconfigured detour rules and a hardware fault caused traffic to bypass local scrubbers. Malicious traffic entered directly via the backbone (LAX IP Transit).
The "Red Herring": We initially focused on refining rules, not realizing the mitigation equipment itself had a hardware/software fault. This misled our diagnosis and delayed the fix.
3. Resource Contention The concurrent critical failure in LAX required non-stop coordination, splitting our engineering resources and inevitably slowing down the HKG diagnosis.
🛡️ Future Prevention & Commitment
Stricter Auditing: We will implement an extra layer to manually review every text field on vendor orders to ensure delivered configurations (like Prefix Limits and LACP speeds) match our requirements perfectly.
The Reality: DDoS vectors evolve rapidly. While we cannot guarantee zero incidents, DMIT commits to using every resource to maintain stability and protect your business at reasonable costs.
================
Reimbursement: All services no matter location and network profile will have traffic reset on today, and everything an extra chance for free to reset the traffic before May 2026. (Deliver in the future by the website feature.)