The wrong way to use DORA Metrics.
If you’re not aware, so-called DORA metrics are the core metrics DevOps report is built on:
- Deployment frequency
- Lead time for changes
- Change failure rate
- Time to restore service
- Reliability
These metrics are frequently used to measure the performance of a team. So, this article highlights some pitfalls of using DORA metrics for measuring productivity, including, of course, the good old Campbell’s Law.
#culture
Post #2506
3.42K